日韩欧乱色一区二区三区在线_国产精品视频免费观看_99视频有精品_欧美日韩精品一区二区天天拍小说

網站公告-NOTICE

新聞資訊

當前位置:首頁 / 新聞資訊

濟南電纜橋架設計安裝標準和施工要求

  結合《建筑電氣工程施工質量驗收規范》和《民用建筑電氣設計規范》等現行標準及工程實踐,整理歸納的電纜橋架安裝技術和設計要點,如下:

  Based on current standards and engineering practices such as the "Code for Acceptance of Construction Quality of Building Electrical Engineering" and the "Code for Electrical Design of Civil Buildings", the cable tray installation technology and design points are summarized as follows:base64_image

  一、間距要求電纜橋架在穿過防火墻及防火樓板時,應采取防火隔離措施,防止火災沿線路延燃;防火隔離墻、板,應配合土建施工預留洞口,在洞口處預埋好護邊角鋼,施工時根據電纜敷設的層數和根數用L50×50×5角鋼作固定框,同時將固定柜焊在護邊角鋼上;也可以先作好框在土建施工中砌體或澆灌混凝土時安裝在墻、板中。

  1、 The safety distance requirement is that when cable trays pass through firewalls and fire-resistant floors, fire-resistant isolation measures should be taken to prevent fires from spreading along the line; Fire isolation walls and panels should be equipped with reserved openings for civil construction, and edge protection angle steel should be pre embedded at the openings. During construction, L50 × 50 × 5 angle steel should be used as a fixed frame according to the number of layers and cables laid, and the fixed cabinet should be welded to the edge protection angle steel; Alternatively, the frame can be installed in the wall or slab during masonry or concrete pouring in civil construction.

  注:與可燃管道交叉時凈距≥100mm;間距不足時需采用石棉板、防火隔板等隔離措施。

  Note: When crossing with combustible pipelines, the clear distance should be ≥ 100mm; if the distance is insufficient, isolation measures such as asbestos board and fireproof partition should be used.

  二、接地與連接規范橋架安裝選擇

  2、 Grounding and connection specifications - Bridge installation selection

  需屏蔽電氣干擾的電纜回路,有腐蝕的場所、易燃粉塵場所,應選用無孔封閉型托盤;在容易積灰和其它需遮蓋的環境或戶外場所,宜帶有蓋板。低壓電力電纜與控制電纜共用同一托盤或梯架時,應選用中間有隔板的托盤或梯架;在托盤、梯架分支、引上、引下處應設適當的彎通;因受空間條件限制不便裝設彎通或有特殊要求時,可選用軟連接板、鉸接板;伸縮縫應設置伸縮板;連接兩段不同寬度或高度的托盤、梯架可配置變寬或變高板。

  Cable circuits that require shielding from electrical interference, places with corrosion, and places with flammable dust should use non porous enclosed trays; In environments or outdoor places that are prone to dust accumulation and require cover, it is advisable to have a cover plate. When low-voltage power cables and control cables share the same tray or ladder, a tray or ladder with a partition in the middle should be selected; Appropriate bends should be installed at the branching, leading up, and leading down points of pallets and ladders; When it is inconvenient to install bends due to space constraints or there are special requirements, soft connecting plates or hinged plates can be used; Expansion joints should be equipped with expansion plates; Connecting two trays or ladders of different widths or heights can be configured with variable width or height boards.

  1.接地要求:金屬橋架及支架全長≥2處接地(與PE/PEN干線連接)。非鍍鋅橋架連接板兩端跨接≥4mm?銅芯接地線。鍍鋅橋架連接板兩端用≥2個防松螺栓固定(無需跨接線)。

  1. Grounding requirements: Metal cable trays and supports must be grounded at least 2 points along their entire length (connected to PE/PEN main lines). Both ends of the non galvanized bridge connecting plate should be bridged with a copper core grounding wire of ≥ 4mm. The two ends of the galvanized bridge connecting plate are fixed with ≥ 2 anti loosening bolts (no need for jumper wires).

  2.橋架選型:場景橋架類型屏蔽干擾/腐蝕環境無蓋無孔封閉托盤積灰/戶外環境帶蓋板槽式橋架電力+控制電纜共用中間帶隔板的托盤/梯架空間受限/特殊走向設軟連接板、鉸接板伸縮縫處理設伸縮板(金屬橋架每50m設20-30mm)

  2. Cable tray selection: Recommended scenario: Cable tray type: Shielding interference/Corrosive environment without cover or hole, enclosed tray with dust accumulation/Outdoor environment with cover plate, trough type cable tray with power and control cable sharing, tray with partition in the middle, ladder rack with limited space/Special direction, flexible connection plate, hinged plate, expansion joint treatment, expansion plate (metal cable tray with 20-30mm every 50m)

  三、安裝工藝標準

  3、 Installation process standards

  電纜橋架處如有防火要求的場所,應采取防火隔離措施。電纜敷設嚴禁有絞擰、鎧裝壓扁、護層斷裂和表面嚴重劃傷等缺陷。電纜橋架安裝工藝流程:定位放線→預埋鐵件或膨脹螺栓→支、吊、托架安裝→橋架安裝→保護接地安裝。

  If there are fire prevention requirements at the cable tray location, fire isolation measures should be taken. Cable laying must strictly prohibit defects such as twisting, flattening of armor, breakage of protective layer, and severe surface scratches. Installation process of cable tray: positioning and laying out → pre embedded iron parts or expansion bolts → installation of supports, hangers, and brackets → installation of cable tray → installation of protective grounding.

  1. 支架安裝預埋件自制加工件≥120mm×80mm×6mm,錨固圓鋼≥Φ10mm。支/吊架規格扁鋼≥30mm×3mm,角鋼≥25mm×25mm×3mm。當橋架寬度<300mm時,應在距非直線段與直線結合處300-600m的直線段側設置一個支、吊架。當橋架寬度>300mm時,在非直線段中部還應增設一個支、吊架。固定間距水平敷設1.5~3m;垂直敷設≤2m。轉彎、接線盒、變形縫兩端500mm內需增設支點。戶內支、吊短跨距一般采取1.5-3m。戶外立柱中跨距一般采取6m。多層橋架間距拉擠玻璃鋼電纜橋架多層設置時,層間中心距為200,250,300,350mm。金屬橋架直線段每隔50m應予留伸縮縫20-30mm(安裝伸縮板及跨接地線)。注:橋架與支架間螺栓、橋架連接板螺栓緊固無遺漏,螺母位于橋架外側。

  1. The installation of bracket embedded parts and self-made processed parts should be ≥ 120mm × 80mm × 6mm, and the anchoring round steel should be ≥ Φ 10mm. The specifications of the support/hanger are flat steel ≥ 30mm × 3mm and angle steel ≥ 25mm × 25mm × 3mm. When the width of the bridge is less than 300mm, a support/hanger should be installed on the side of the straight section 300-600m away from the junction of the non-linear section and the straight section. When the width of the bridge is greater than 300mm, an additional support or hanger should be added in the middle of the non-linear section. Horizontal laying with fixed spacing of 1.5-3m; vertical laying ≤ 2m. Additional support points need to be added within 500mm at both ends of bends, junction boxes, and deformation joints. The short span for indoor support and suspension is generally 1.5-3m. The span for outdoor columns is generally 6m. When multiple layers of fiberglass cable trays are installed, the center distance between layers is 200250300350mm. Expansion joints of 20-30mm should be left every 50m for straight sections of metal trays (installation of expansion plates and grounding wires). Note: The bolts between the bridge and the bracket, as well as the bolts of the bridge connecting plate, are tightened without omission, and the nuts are located on the outside of the bridge.

  2. 橋架敷設項目要求水平敷設支撐跨距1.5~3m;坡度≥1/100(室外進室內)垂直敷設纜線每1.5m固定一次彎曲段支撐彎曲半徑≤300mm時,距彎頭300~600mm設支點;>300mm時彎通中部增設支點多層橋架層間距:200/250/300/350mm(玻璃鋼橋架)填充率橫斷面≤50%;吊頂內槽蓋開啟面凈空≥80mm綁扎要求水平/垂直段需綁扎;24根4對線為1束;綁扎間距≤1.5m注:當鋁合金橋架與鋼支架固定時,有相互間絕緣防電化措施腐蝕措施,一般可墊石棉墊。電纜橋架在電氣豎井內敷設,可采用角鋼固定。

  2. The bridge laying project requires horizontal laying with a support span of 1.5~3m; for vertical laying of cables with a slope of ≥ 1/100 (outdoor to indoor), a bending section is fixed every 1.5m to support the bending radius ≤ 300mm. When the bending radius is ≤ 300mm, a fulcrum is set at a distance of 300~600mm from the elbow; When the distance between the layers of the multi-layer bridge with a pivot point added in the middle of the bend is greater than 300mm: 200/250/300/350mm (fiberglass bridge) filling rate, cross-sectional area ≤ 50%; The clear clearance of the opening surface of the groove cover in the ceiling should be ≥ 80mm, and the horizontal/vertical sections should be tied; 24 pairs of wires form one bundle; Binding spacing ≤ 1.5m Note: When the aluminum alloy bridge is fixed to the steel bracket, there are mutual insulation and corrosion prevention measures, and asbestos pads can generally be used. The cable tray is laid in the electrical shaft and can be fixed with angle steel.

  3. 特殊節點處理伸縮節鋼橋架>30m、鋁合金/玻璃鋼橋架>15m時設置。跨越伸縮縫處設置補償裝置,可用帶伸縮節的橋架。防火隔離穿越防火墻/樓板時,用防火包/防火泥封堵洞口(配合L50×50×5角鋼框架)。設備交叉橋架與用電設備凈距≥0.5m;同高度平行橋架間距≥0.6m。注:敷設在豎井內和穿越不同防火區的橋架,應有防火隔離措施。

  3. Special node processing shall be set for expansion joint steel bridge>30m and aluminum alloy/fiberglass bridge>15m. Set up compensation devices at the expansion joints, and use cable trays with expansion joints. When passing through firewalls/floors for fire isolation, seal the openings with fireproof bags/fireproof mud (in conjunction with L50 × 50 × 5 angle steel frame). The clear distance between the cross bridge of equipment and the electrical equipment is ≥ 0.5m; the distance between parallel bridge bridges at the same height is ≥ 0.6m. Note: Bridge bridges laid in vertical shafts and crossing different fire zones should have fire isolation measures.

  四、質量驗收強制性要求

  4、 Mandatory requirements for quality acceptance

  (1)槽式大跨距電纜橋架由室外進入建筑物內時,橋架向外的坡度不得小于1/100。

  (1) When the trough type large-span cable tray enters the building from the outside, the outward slope of the tray shall not be less than 1/100.

  (2)電纜橋架與用電設備交越時,其間的凈距不小于0.5m。鋁合金橋架與鋼支架間需絕緣(如墊石棉墊;禁用石棉地區可改用陶瓷纖維墊)。

  (2) When the cable tray intersects with electrical equipment, the clear distance between them should not be less than 0.5m. The aluminum alloy tray and steel support should be insulated (such as with asbestos pads; ceramic fiber pads can be used in areas where asbestos is prohibited).

  (3)兩組電纜橋架在同一高度平行敷設時,其間凈距不小于0.6m。

  (3) When two sets of cable trays are laid parallel at the same height, the clear distance between them should not be less than 0.6m.

  (4)電纜橋架宜高出地面2.2米以上,橋架頂部距頂棚或其它障礙物不應小于0.3米,橋架寬度不宜小于0.1米。橋架內橫斷面的填充率不應超過40%,控制電纜可放寬到50%。

  (4) The cable tray should be at least 2.2 meters above the ground, and the distance between the top of the tray and the ceiling or other obstacles should not be less than 0.3 meters. The width of the tray should not be less than 0.1 meters. The filling rate of the cross-section inside the bridge should not exceed 40%, and the control cable can be relaxed to 50%.

  (5)電纜橋架內纜線垂直敷設時,在纜線的上端和每間隔1.5米處應固定在橋架的支架上;水平敷設時, 在纜線的首、尾、轉彎及每間隔3~5米處進行固定。

  (5) When the cables are vertically laid in the cable tray, they should be fixed on the brackets of the tray at the upper end and every 1.5 meters; When laying horizontally, fix the cable at the beginning, end, turn, and every 3-5 meters.

  (6)在吊頂內設置時,槽蓋開啟面應保持80毫米的垂直凈空,線槽截面利用率不應超過50%。

  (6) When installed in the ceiling, the opening surface of the trough cover should maintain a vertical clearance of 80 millimeters, and the utilization rate of the trough section should not exceed 50%.

  (7)布放在線槽的纜線可以不綁扎,槽內纜線應順直,盡量不交叉;纜線不應溢出線槽;在纜線進出線槽部位, 轉彎處應綁扎固定。垂直線槽布放纜線應每間隔1.5米固定在纜線支架上。

  (7) The cables laid in the cable trough can be left unbound, and the cables inside the trough should be straight and avoid crossing as much as possible; Cables should not overflow from cable trays; At the entrance and exit of the cable tray, the turning points should be tied and fixed. The cables laid in the vertical cable tray should be fixed on the cable support every 1.5 meters.

  (8)在水平、垂直橋架和垂直線槽中敷設線時,應對纜線進行綁扎。綁扎間距不宜大于1.5米,扣間距應均勻,松緊適度。

  (8) When laying wires in horizontal and vertical cable trays and vertical trunking, the cables should be tied. The binding spacing should not exceed 1.5 meters, the buckle spacing should be uniform, and the tightness should be moderate.

  (9)橋架水平敷設時,支撐間距一般為1.5-3m,垂直敷設時固定在建筑物構體上的間距宜小于2m。

  (9) When laying the bridge horizontally, the support spacing is generally 1.5-3m, and when laying vertically, the spacing fixed on the building structure should be less than 2m.

  (10)橋架不得出現絞擰、壓扁、護層斷裂或深度劃傷。

  (10) The bridge frame shall not have twisting, flattening, broken protective layer or deep scratches.

  (11)螺栓緊固無遺漏,螺母位于橋架外側。(12)接地連接可靠,導通電阻≤0.1Ω。

  (11) The bolts are tightened without omission, and the nuts are located on the outside of the bridge. (12) The grounding connection is reliable, with a conduction resistance of ≤ 0.1 Ω.

  本文由  濟南電纜橋架 友情奉獻.更多有關的知識請點擊  http://www.12xw.com/  真誠的態度.為您提供為的服務.更多有關的知識我們將會陸續向大家奉獻.敬請期待.

  This article is a friendly contribution from Jinan Cable Bridge For more related knowledge, please click http://www.12xw.com/ Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.

 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
日韩欧乱色一区二区三区在线_国产精品视频免费观看_99视频有精品_欧美日韩精品一区二区天天拍小说
99精品99| 国产精品久久久久久久免费软件 | 欧美日韩在线观看一区二区三区 | 亚洲欧洲日本在线| 亚洲精品欧洲| 亚洲调教视频在线观看| 欧美精品日日鲁夜夜添| 久久精品久久99精品久久| 亚洲麻豆av| 亚洲图片欧美一区| 久久国产精品一区二区三区四区| 噜噜噜91成人网| 欧美视频手机在线| 国产一区二区三区在线观看免费视频 | 日韩亚洲欧美精品| 亚洲欧美在线x视频| 久久一区二区三区四区| 欧美色综合网| 欲色影视综合吧| 亚洲男人第一av网站| 欧美99久久| 欧美日本国产一区| 国产日韩av高清| 日韩午夜在线| 久久亚裔精品欧美| 国产精品国产三级国产aⅴ无密码 国产精品国产三级国产aⅴ入口 | 亚洲欧美视频在线观看| 美女在线一区二区| 国产精品推荐精品| 亚洲精品自在在线观看| 久久爱www| 国产精品magnet| 亚洲二区在线观看| 欧美一区二区三区在线播放| 欧美精品日日鲁夜夜添| 韩国三级在线一区| 亚洲欧美日韩一区二区在线| 欧美成人中文字幕| 好看不卡的中文字幕| 亚洲综合99| 欧美日韩国产精品一卡| 在线观看欧美视频| 久久er99精品| 国产精品丝袜久久久久久app| 亚洲精品少妇| 免费看亚洲片| 激情久久综艺| 亚洲精品日日夜夜| 久久精品中文字幕免费mv| 欧美午夜视频在线| 亚洲精品一区二区三| 久久综合成人精品亚洲另类欧美| 国产精品视频免费在线观看| 一区二区成人精品| 欧美精品午夜| 亚洲国产天堂久久国产91| 久久久久国产精品午夜一区| 国产美女精品一区二区三区| 亚洲视频自拍偷拍| 欧美日韩一区二区三区免费| 亚洲国产欧美精品| 久久午夜激情| 韩国欧美一区| 久久久精品网| 狠狠色丁香久久婷婷综合_中| 午夜精品偷拍| 国产免费亚洲高清| 性欧美xxxx大乳国产app| 国产精品久久久久免费a∨| 中文亚洲字幕| 欧美日韩妖精视频| 一本色道久久综合精品竹菊| 欧美精品激情blacked18| 亚洲肉体裸体xxxx137| 欧美成人午夜免费视在线看片 | 国产精品视频| 亚洲在线一区| 国产精品美女久久久| 亚洲夜间福利| 国产精品毛片大码女人| 亚洲一区综合| 国产麻豆午夜三级精品| 欧美一区二区高清在线观看| 国产午夜精品美女毛片视频| 久久九九免费| 亚洲电影在线观看| 欧美激情在线| 99视频有精品| 国产精品久久影院| 欧美在线视频一区二区三区| 国产一区二区三区免费不卡| 久久久久免费观看| 伊人激情综合| 欧美二区不卡| 一区二区三区免费观看| 国产精品久久一区二区三区| 午夜视频在线观看一区二区三区| 国产亚洲欧美一区| 另类天堂视频在线观看| 亚洲精品123区| 欧美丝袜第一区| 翔田千里一区二区| 影音先锋日韩资源| 欧美极品一区| 亚洲欧美经典视频| 国模私拍一区二区三区| 亚洲午夜精品视频| 国产乱人伦精品一区二区 | 亚洲国产成人久久综合一区| 欧美激情1区| 亚洲一区二区免费在线| 国产日韩精品久久| 米奇777超碰欧美日韩亚洲| 亚洲经典视频在线观看| 欧美亚一区二区| 欧美一区二区啪啪| 亚洲国产免费看| 欧美日韩一区二区三区在线视频| 亚洲午夜女主播在线直播| 国产日韩欧美一二三区| 久久综合色88| 一本一道久久综合狠狠老精东影业| 国产精品成人午夜| 久久精选视频| 99riav国产精品| 国产日产欧美a一级在线| 免费视频一区二区三区在线观看| 99国产精品久久久久久久久久| 国产精品永久免费观看| 久久综合久久综合这里只有精品| 一二三区精品福利视频| 国内精品免费午夜毛片| 欧美日韩hd| 久久国产乱子精品免费女| 亚洲日本视频| 国产日韩在线视频| 欧美日本国产精品| 久久久蜜桃精品| 亚洲视频一区在线观看| 激情成人中文字幕| 国产精品入口麻豆原神| 男女av一区三区二区色多| 亚洲欧美国产一区二区三区| 亚洲高清av在线| 国产欧美日韩一区二区三区在线| 欧美成人午夜视频| 欧美在线你懂的| 国产精品99久久久久久有的能看 | 亚洲精品欧美在线| 国产日韩一区二区三区| 欧美精品久久久久a| 久久成人精品电影| 日韩一级精品| 亚洲第一精品夜夜躁人人躁 | 亚洲美女区一区| 国产在线观看91精品一区| 欧美日韩国产片| 美国十次成人| 欧美伊人久久久久久午夜久久久久 | 亚洲欧洲日产国码二区| 国产手机视频精品| 欧美午夜不卡| 欧美黄色aa电影| 狼人社综合社区| 欧美亚洲一区二区在线| 亚洲视频在线视频| 亚洲理伦在线| 亚洲电影成人| 黄色成人av网站| 国产人成一区二区三区影院| 欧美婷婷在线| 欧美日本在线播放| 免费欧美在线视频| 久久久久久日产精品| 欧美一级久久久| 亚洲欧美日本另类| 一区二区三区三区在线| 亚洲人妖在线| 亚洲国产欧美日韩精品| 一色屋精品视频在线观看网站| 国产欧美一区二区三区久久 | 欧美日韩精品一区二区| 欧美国产三区| 美女网站久久| 久久亚洲私人国产精品va媚药| 欧美一区二区大片| 亚洲欧美变态国产另类| 亚洲图片欧洲图片av| 一本久道久久综合中文字幕| 亚洲精品日日夜夜| 亚洲日本在线视频观看| 亚洲欧洲三级| 亚洲区欧美区| 亚洲理伦在线| 夜夜嗨av一区二区三区网页 | 久久久久久国产精品一区| 欧美一区二区在线免费观看| 亚洲主播在线| 亚洲欧美日韩国产| 午夜一级久久| 欧美亚洲一区二区在线观看| 校园春色国产精品| 欧美伊人久久大香线蕉综合69| 欧美一级大片在线观看|