  電纜橋架作為電力與通信線路的重要載體,其安裝質量直接影響系統運行與使用壽命。從施工準備到驗收交付,每個環節均需嚴格遵循技術規范,確保橋架系統穩固可靠。

  As an important carrier of power and communication lines, the installation quality of cable trays directly affects the safety and service life of the system operation. From construction preparation to acceptance and delivery, every step must strictly follow technical specifications to ensure the stability and reliability of the bridge system.

  安裝前需對施工環境進行勘查。確認建筑結構承重能力,混凝土強度需達到C20以上方可進行膨脹螺栓固定。對于鋼結構廠房,需檢測橫梁撓度,確保橋架荷載不超過設計值的70%。環境溫濕度同樣關鍵,低溫環境下金屬橋架收縮率可達0.02%/℃,需預留熱脹冷縮補償量;潮濕區域則需選用鍍鋅厚度≥65μm的橋架,防止銹蝕。

  A comprehensive survey of the construction environment is required before installation. The key is to confirm the load-bearing capacity of the building structure, and the concrete strength must reach C20 or above before expansion bolt fixation can be carried out. For steel structure factories, it is necessary to detect the deflection of the crossbeam to ensure that the bridge load does not exceed 70% of the design value. The temperature and humidity of the environment are equally critical. The shrinkage rate of metal cable trays can reach 0.02%/℃ in low-temperature environments, and compensation for thermal expansion and contraction needs to be reserved; In damp areas, cable trays with a galvanized thickness of ≥ 65 μ m should be selected to prevent rusting.

  工具與材料驗收是質量控制的首道關卡。電動扳手扭矩需校準±5%,確保M10螺栓緊固力矩達標。橋架本體檢測需涵蓋外觀、尺寸與鍍層厚度,使用涂層測厚儀隨機抽檢,鍍鋅層厚度不足60μm或噴塑層附著力不達1級標準的產品禁止使用??缃訉Ь€需采用4mm2銅編織帶,截面積不足將影響接地連續性。

  The acceptance of tools and materials is the first hurdle in quality control. The torque of the electric wrench needs to be calibrated to ± 5% to ensure that the tightening torque of the M10 bolt meets the standard. The inspection of the bridge body should cover appearance, size, and coating thickness. A coating thickness gauge should be used for random sampling. Products with a galvanized layer thickness of less than 60 μ m or a spray coating adhesion that does not meet Level 1 standards are prohibited from use. The jumper wire needs to use 4mm 2 copper braided tape, and insufficient cross-sectional area will affect grounding continuity.

  定位劃線階段需建立三維坐標系。水平誤差每米不得超過2mm,全長偏差控制在10mm以內,使用激光投線儀配合墨斗彈線。轉角處需采用45°拼接工藝,避免直角彎頭造成的線路磨損。對于多層橋架,垂直間距需預留200mm以上,便于散熱與維護,底部距地面高度不宜低于2.5米,防止機械損傷。

  The positioning and marking stage requires the establishment of a three-dimensional coordinate system. The horizontal error shall not exceed 2mm per meter, and the overall deviation shall be controlled within 10mm. A laser projector shall be used in conjunction with an ink fountain to mark the line. 45 ° splicing technology should be used at the corner to avoid line wear caused by right angle bends. For multi-layer cable trays, a vertical spacing of at least 200mm should be reserved for heat dissipation and maintenance. The bottom should not be less than 2.5 meters above the ground to prevent mechanical damage.

20221114120958540.jpg

  支吊架安裝是確保橋架穩定性的核心環節。膨脹螺栓埋深需達到80mm以上,使用扭矩扳手分兩次緊固,達到設計值70%,二次復緊間隔24小時。吊架間距需根據橋架規格調整,200mm寬橋架間距不得超過1.5米,超過400mm寬需增設縱向抗震支吊架。對于非直線段,每3米需增設固定支架,防止變形。

  The installation of supports and hangers is the core link to ensure the stability of the bridge. The burial depth of the expansion bolt should be at least 80mm, and it should be tightened twice with a torque wrench. The first tightening should reach 70% of the design value, and the second tightening should be spaced 24 hours apart. The spacing between hangers should be adjusted according to the specifications of the bridge frame. The spacing between 200mm wide bridge frames should not exceed 1.5 meters, and longitudinal seismic support hangers should be added if the width exceeds 400mm. For non-linear sections, fixed brackets should be added every 3 meters to prevent deformation.

  橋架組裝需遵循“先下后上、先內后外”原則。連接板螺栓緊固順序需對稱交叉進行,避免單邊受力導致密封不嚴。蓋板安裝前需清理內部雜物,使用吸塵器配合粘毛滾筒,防止金屬碎屑損傷電纜絕緣層。對于防火橋架,需檢查防火封堵是否嚴密,防火泥填充率需達95%以上,孔洞處需加裝防火包。

  The assembly of cable trays should follow the principle of "from bottom to top, from inside to outside". The tightening sequence of the connecting plate bolts should be symmetrically crossed to avoid insufficient sealing caused by unilateral force. Before installing the cover plate, it is necessary to clean the internal debris and use a vacuum cleaner in conjunction with a glue roller to prevent metal debris from damaging the cable insulation layer. For fireproof cable trays, it is necessary to check whether the fireproof sealing is tight, the fireproof mud filling rate should be above 95%, and fireproof bags should be installed at the holes.

  接地處理是保障系統的關鍵步驟。每段橋架需保證2處以上接地連接,跨接導線與橋架接觸面需去除鍍層,露出金屬本色后涂抹導電膏??偟入娢宦摻Y箱接地電阻不得大于1Ω,使用接地電阻測試儀分三次測量取平均值。對于強電與弱電共架場景,需采用分隔板隔離,間距保持300mm以上,防止電磁干擾。

  Grounding treatment is a crucial step in ensuring system safety. Each section of the bridge should ensure at least 2 grounding connections, and the contact surface between the jumper wire and the bridge should have its coating removed. After exposing the natural color of the metal, conductive paste should be applied. The grounding resistance of the total equipotential bonding box shall not exceed 1 Ω, and the grounding resistance tester shall be used to measure the average value in three separate measurements. For the scenario of strong and weak electricity sharing the same frame, a partition board should be used for isolation, with a spacing of at least 300mm to prevent electromagnetic interference.

  特殊環境安裝需采取專項措施。腐蝕性區域橋架需做三防處理,底漆干膜厚度≥50μm,面漆耐鹽霧性能需達720小時以上。高溫場所應選用耐溫150℃以上的硅橡膠密封條,橋架頂部需加裝隔熱板。振動設備附近需安裝彈性支架,固有頻率避開設備振動頻率50%以上,避免共振導致的疲勞損傷。

  Special measures need to be taken for installation in special environments. Corrosive area cable trays need to undergo three protection treatments, with a dry film thickness of ≥ 50 μ m for the primer and a salt spray resistance of at least 720 hours for the topcoat. Silicone rubber sealing strips with a temperature resistance of 150 ℃ or above should be used in high-temperature places, and insulation boards should be installed on the top of the bridge. Elastic supports should be installed near vibration equipment, with natural frequencies avoiding over 50% of the equipment's vibration frequency to prevent fatigue damage caused by resonance.

  驗收階段需進行多維度檢測。外觀檢查采用5倍放大鏡,查看焊縫、涂層缺陷。載荷試驗需加載設計值的150%,持續2小時無變形。接地連續性測試需在潮濕環境下進行,確保接觸電阻≤0.01Ω。提交的竣工資料需包含三維走向圖、材料合格證及第三方檢測報告,實現全生命周期可追溯。

  Multi dimensional testing is required during the acceptance stage. The appearance inspection adopts a 5x magnifying glass, focusing on inspecting weld seams and coating defects. The load test needs to be loaded to 150% of the design value for 2 hours without permanent deformation. The grounding continuity test should be conducted in a humid environment to ensure that the contact resistance is ≤ 0.01 Ω. The submitted completion documents must include a three-dimensional directional diagram, material qualification certificate, and third-party inspection report to achieve full lifecycle traceability.

  本文由濟南電纜橋架友情奉獻.更多有關的知識請點擊  http://www.12xw.com   真誠的態度.為您提供為的服務.更多有關的知識我們將會陸續向大家奉獻.敬請期待.

  This article is a friendly contribution from Jinan Cable Bridge For more related knowledge, please click http://www.12xw.com Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.山東電纜橋架

 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
日韩欧乱色一区二区三区在线_国产精品视频免费观看_99视频有精品_欧美日韩精品一区二区天天拍小说
久久一区二区精品| 亚洲美女黄网| 国产精品一区二区视频| 国产精品综合不卡av| 国产一区二区三区黄视频| 国产日本亚洲高清| 亚洲成人在线视频网站| 日韩午夜免费视频| 性欧美videos另类喷潮| 美女精品一区| 欧美性猛交99久久久久99按摩| 国产日韩av一区二区| 亚洲国产视频a| 亚洲欧美国产日韩天堂区| 老色鬼精品视频在线观看播放| 欧美日韩视频在线观看一区二区三区| 国产精品视频yy9099| 在线观看日韩av电影| 亚洲视频你懂的| 久久久亚洲精品一区二区三区| 欧美日韩国产免费观看| 国产日韩一区二区三区| 亚洲精品国产精品国自产观看浪潮| 亚洲一区二区三区在线看| 久久三级福利| 国产精品乱码久久久久久| 在线不卡中文字幕播放| 亚洲欧美日韩精品久久亚洲区| 猫咪成人在线观看| 国产精品爽爽ⅴa在线观看| 亚洲国产日韩欧美| 午夜精品网站| 欧美日本亚洲| 激情久久久久久久久久久久久久久久| 一本久久综合| 猛干欧美女孩| 国产精品日韩欧美一区| 亚洲精品国产系列| 久久久久国产成人精品亚洲午夜| 欧美午夜激情视频| 91久久精品国产91久久性色tv| 欧美在线视频日韩| 欧美日韩亚洲一区| 在线免费一区三区| 羞羞视频在线观看欧美| 欧美日韩调教| 亚洲国产高清一区| 久久精品天堂| 国产精品一二一区| 一区二区三区高清不卡| 欧美成人性生活| 国内精品一区二区三区| 亚洲欧美日韩精品久久| 欧美欧美天天天天操| 在线精品视频在线观看高清| 午夜精品在线| 国产精品久久久久9999| 99国产精品视频免费观看一公开| 欧美91视频| 亚洲国产成人不卡| 久久在线观看视频| 激情自拍一区| 久久久xxx| 国产一区二区三区免费不卡 | 精品不卡一区二区三区| 午夜在线精品偷拍| 国产精品日本| 亚洲欧美精品在线观看| 欧美午夜电影在线观看| 一区二区免费在线播放| 欧美日韩成人一区二区三区| 91久久精品美女高潮| 欧美jizzhd精品欧美巨大免费| 一区精品在线播放| 卡通动漫国产精品| 在线观看日韩av先锋影音电影院| 久久久久一区二区三区| 国内精品视频在线观看| 久久久久一区| 在线看无码的免费网站| 猫咪成人在线观看| 91久久精品国产| 欧美激情视频免费观看| 亚洲精品综合| 欧美日产国产成人免费图片| 日韩写真视频在线观看| 国产精品福利在线观看| 亚洲性视频网站| 国产精品一二三视频| 欧美在线一二三| 极品少妇一区二区三区| 激情久久久久久久| 久久久久国产精品厨房| 极品中文字幕一区| 蜜臀av性久久久久蜜臀aⅴ| 亚洲精品1234| 欧美日韩精品久久久| 亚洲视屏在线播放| 国产精品久久影院| 欧美在线视频一区二区三区| 狠狠色综合网站久久久久久久| 久久亚洲私人国产精品va| 亚洲经典三级| 欧美视频中文一区二区三区在线观看 | 欧美日在线观看| 亚洲在线观看| 国内精品久久久久久影视8| 美女网站久久| 99精品国产一区二区青青牛奶| 欧美午夜电影网| 欧美影院一区| 亚洲国产精品ⅴa在线观看 | 久久综合亚州| 这里只有视频精品| 国产日韩一级二级三级| 久久一本综合频道| 99国内精品久久| 国产欧美日韩高清| 久久伊人亚洲| 亚洲视频二区| 国内一区二区三区| 欧美精品手机在线| 午夜精品一区二区在线观看| 尤妮丝一区二区裸体视频| 欧美日韩国产精品成人| 性娇小13――14欧美| 亚洲高清在线| 国产精品久久久爽爽爽麻豆色哟哟| 欧美在线亚洲在线| 99re8这里有精品热视频免费 | 国产精品一区二区三区乱码| 久久只有精品| 中日韩男男gay无套| 韩日精品在线| 欧美色视频日本高清在线观看| 欧美在线免费看| 亚洲美女精品一区| 国产亚洲综合在线| 欧美区一区二| 久久久综合免费视频| 亚洲午夜久久久| 亚洲第一在线| 国产精品一区二区你懂得| 欧美国产日产韩国视频| 欧美伊人久久| 亚洲精品一区二区三区四区高清| 国产乱码精品一区二区三区忘忧草 | 亚洲国产成人在线视频| 国产精品乱码妇女bbbb| 免费在线看一区| 亚洲欧美日韩在线播放| 亚洲欧洲一区二区天堂久久| 国产精品欧美一区二区三区奶水| 欧美成人xxx| 欧美伊人久久大香线蕉综合69| 一本色道久久综合亚洲精品不| 在线成人h网| 国产精品视频免费在线观看| 欧美肥婆在线| 久久精品视频在线播放| 亚洲女人av| 日韩亚洲欧美高清| 亚洲第一页在线| 国产亚洲人成网站在线观看| 欧美日韩精品中文字幕| 久久精品夜色噜噜亚洲aⅴ| 亚洲一二三四区| 亚洲精品一区中文| 亚洲第一福利在线观看| 国产视频一区三区| 国产精品高潮视频| 久久综合九色99| 亚洲另类自拍| 伊人狠狠色丁香综合尤物| 国产精品素人视频| 欧美日韩在线观看视频| 欧美国产免费| 美国十次了思思久久精品导航| 欧美专区在线| 午夜欧美理论片| 亚洲一区二区三区激情| 9色porny自拍视频一区二区| 亚洲国产精品久久久久秋霞蜜臀| 国产一区二区三区在线免费观看| 国产精品免费观看在线| 欧美视频免费在线| 欧美国产日韩一区二区| 免费观看日韩| 免费成人高清在线视频| 久久久久久亚洲精品中文字幕 | 韩国三级电影一区二区| 国产欧美日韩综合精品二区| 国产精品入口夜色视频大尺度| 欧美四级电影网站| 欧美日韩国产二区| 欧美另类69精品久久久久9999| 欧美国产激情| 欧美激情一区二区三区高清视频| 欧美高潮视频| 欧美黄在线观看| 欧美精品一区二| 欧美日韩国产限制| 欧美日韩亚洲不卡| 国产精品极品美女粉嫩高清在线|